Engineering services

Engineering services

Inspection of dielectric equipment

We provide the following testing services for dielectric equipment:

  • check We inspect and test dielectric equipment designed to protect against electrical hazards
  • check We carry out tests in UAB ‘SDG’s’ specialised mobile laboratory
  • check We assess the suitability and resistance of protective equipment to electrical effects
  • check Following the test, we provide a report containing the test results and the date of the next inspection
  • check We test dielectric gloves every 6 months
  • check We test tools with insulated handles – every 12 months
  • check We test voltage indicators – every 12 months
  • check We test operational insulating poles – every 24 months
  • check We test dielectric footwear (galoshes) – every 12 months.
  • check We test dielectric footwear (boots) – every 36 months.
  • check We check dielectric mats before use